Apron Roof Flashing Nz

A flashing which runs horizontal to the corrugate and has a vertical upstand with a 200mm flap folded at the same pitch of the roof with a soft edge at the bottom.
Apron roof flashing nz. Dektite flashings are a range of epdm or silicone polymer flashings distributed in nz by dlm and manufactured by deks industries pty ltd australia. You can also use coloursteel or galvanised flashings available from most hardware stores such as bunnings or mitre 10. As drawn the details do not close off the cavity to water entry blown by wind up the slope of the roof on the apron flashing. Covid 19 update to customers.
New zealand metal roofing manufacturers inc. Visit bunnings new zealand today to find your nearest store. Apron flashing goes against a wall and down onto the polycarbonate roofing. All roof cladding located at the join except gutters require a flashing fastened on both sides of the join.
Check out our wide range of flashings from brands you know trust. Note these flashings do not have corrugations in them. Flashings near the edges of roofs or walls can be subjected to suction or negative wind loads that can be greater than other positive imposed loads. Flashing at a change of pitch for eh wind zone is outside the scope of e2 as1 and must be treated as an alternative method.
Figure 1 apron flashing at roof wall junction horizontal flashing. The range delivers a wide choice of specifically designed innovative products to prevent the ingress of water and dust at service pipes flues and ducts that penetrate roofs or walls. E2 as1 requires eaves flashing see figure 7 to be installed with long run profiled metal roofing in vh or eh wind zones where the roof slope is 10 or less and the soffit width is 100 mm or less from the cladding. I 2 o i build supplement flashings 23.
The fabricated corner flashing needs a stop end with the stop end 35 mm minimum high up to the bottom of the cladding then cut back to also close off the cavity up to the top of the flashings. Raked metal apron flashings must have tapered stop ends to the lower end of the flashing to divert water away from the back of the upstand and into the gutter and have a 5 minimum cross fall see roof to wall junction in build 160.